[LITMUS^RT] Increasing time allocated to the scheduler
Aaron Block
ablock at austincollege.edu
Mon Jan 26 20:57:38 CET 2015
A plugin I am writing right now has a lot of logic in it for what do when a
job completes. The plugin works correctly, except that it crashes when the
system load is high. I might be barking up the wrong tree but I suspect
that my scheduling logic is "taking too long" and this is causing the
kernel to crash. I was wondering if anybody has an idea of how I could
increase the amount of time allocated to the scheduler (if there is even
such a value)
Thanks,
--Aaron
Aaron Block
Assistant Professor of Computer Science
Austin College | Math and Computer Science
900 North Grand Avenue, Suite 61592 | Sherman, Texas 75090
Phone 903.813.2563
austincollege.edu<http://austincollege.edu/>
[cid:4D99A401-FA1C-43BE-B041-E52331DACF4A at earthlink.net]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.litmus-rt.org/pipermail/litmus-dev/attachments/20150126/40dc7444/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.gif
Type: image/gif
Size: 1685 bytes
Desc: image001.gif
URL: <http://lists.litmus-rt.org/pipermail/litmus-dev/attachments/20150126/40dc7444/attachment.gif>
More information about the litmus-dev
mailing list